← Back to grants
GrantSmall businesses not listed as eligible

Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys

Fort Worth District

Award ceiling

$1,657,690

Award floor

$300,000

Opportunity #
W9126G262SOI0520
Agency
Fort Worth District
ALN (CFDA)
12.005
Status
posted
Posted
Sep 4, 2026
Closes
Oct 6, 2026
Funding instrument
Cooperative Agreement
Category
Science and Technology and other Research and Development
Cost sharing required
No

Who can apply

This funding opportunity is ONLY available for Cooperative Ecosystem Study Units under the Gulf Coast, Piedmont-South Atlantic Coast, and South Florida Caribbean Regions.

Synopsis

NOTE: A complete study proposal and proposed budget are not requested at this time. 


NOTE: The established CESU indirect rate is 17.5%. For any Cooperative Agreement entered into in response to this RSOI, a maximum 17.5% indirect cost rate will be paid on work covered by such agreement or any modifications thereto. Unless the agreement specifies otherwise, the basis of direct costs against which the agreement’s indirect cost rate is applied must be either the same base identified in the recipient's federally negotiated indirect cost rate agreement or, if the recipient does not have a federally negotiated indirect cost rate agreement, the Modified Total Direct Cost (MTDC) base.


TITLE OF PROJECT: Groundwater and Surficial Water Salinity Changes in Everglades National Park using Aerial Electromagnetic Surveys


SYNOPSIS OF PROJECT: This project will support the U.S. Army Corps of Engineers (USACE) Jacksonville District by performing Aerial Electromagnetic (AEM) surveys to understand the current spatial extent and rate of saltwater intrusion in the ground and surface waters of the southern Florida Everglades. Results will be integrated with previous survey data conducted over the last 30 years to comprehend the impacts surrounding significant critical habitat loss. Future freshwater-saltwater interface trends will then be estimated to optimize management decisions tied to restoration efforts of the degraded wetland system.


PERIOD OF PERFORMANCE: The Base Period of the agreement will extend 12 months from date of award. Four 12-month Follow-on Periods are anticipated based on availability of funding.


SUBMISSION OF STATEMENT OF INTEREST

• Statements of Interest (SOI) are due by Noon Central Time, 06 October 2026 via email to the parties listed below.

• Direct questions no later than Noon Central Time, 14 September 2026 via email to the parties listed below.

Cheryl R. Vendemia

Grants Specialist

USACE Fort Worth District

Email: Cheryl.R.Vendemia@usace.army.mil

and

Nicole Baker

Project Manager

USACE Fort Worth District 

Email: Nicole.D.Baker@usace.army.mil


Timeline for Review of Statements of Interest: RSOIs are required to be posted on www.Grants.gov for 30 days prior to the Government making a decision and requesting full proposals.  


Refer to RSOI Package for complete details.  Award is anticipated in Fiscal Year 2027. 


Contact

Cheryl Vendemia Grantor · cheryl.r.vendemia@usace.army.mil

View full notice on Grants.gov ↗